Carmichael, R, Edwards, D J and Holt, G D (2007) Plant managers' perceptions of plant security systems. Engineering, Construction and Architectural Management, 14(01), 65–78.

Hackett, J A and Hicks, C M (2007) Estimating as a profession in UK construction. Engineering, Construction and Architectural Management, 14(01), 26–51.

Lansley, P (2007) Making sense of research quality assessment. Engineering, Construction and Architectural Management, 14(01), 7–25.

Lingard, H and Francis, V (2007) “Negative interference” between Australian construction professionals' work and family roles: Evidence of an asymmetrical relationship. Engineering, Construction and Architectural Management, 14(01), 79–93.

Maqsood, T, Walker, D H T and Finegan, A D (2007) Facilitating knowledge pull to deliver innovation through knowledge management: A case study. Engineering, Construction and Architectural Management, 14(01), 94–109.

Stoy, C, Dreier, F and Schalcher, H-R (2007) Construction duration of residential building projects in Germany. Engineering, Construction and Architectural Management, 14(01), 52–64.

  • Type: Journal Article
  • Keywords: construction operations; Germany; regression analysis; residential property
  • ISBN/ISSN: 0969-9988
  • URL: http://www.emeraldinsight.com/10.1108/09699980710716972
  • Abstract:
    Purpose – Planning the construction duration is an important consideration in any construction project. Indicators that permit an early forecast of the duration provide the basis for such planning. To date, such a basis has been lacking in the German-speaking area. This paper aims to discuss this matter. Design/methodology/approach – Indicators are identified that enable a forecast of the construction duration. In addition, a simple regression model is provided to assist in selecting construction speed indicators. This empirical analysis relies on the data, collected on a uniform basis, from 115 German residential buildings. Findings – Project size (measured in m2 gross external floor area) and project standard (measured in building construction cost/m2 gross external floor area) are found to be significant drivers of construction speed. It appears that project size, in contrast to the project standard, is positively correlated with construction speed. Originality/value – An expansion of the data pool is required for more extensive study. On the one hand, this means including relevant drivers that have only been insufficiently considered to date, such as project complexity, project environment, management-related attributes. On the other hand, the data pool must also be expanded to include other types of use.